D   a   y       L   o   g
Saturday 19. augusta 2006
Act. No. Activity nb Began Ended Length prescribed Bonus / Deficit
ideal less least
I SL -2 6.5 8.5 7 6 5.5 -1.5
II EX   0.75     ms
III MCh 6.5 7 0.5 1.25     0.75
II–III M       0.5 2     NA
IV FL   0.25    
V PrM       0.25    
VI QU   0.5    
IV–VI US         1     NA
VII S1 4 2.75 2 ms
VIII S2a 1    
IX FP   7 9.25 2.25   2.5 4  
X FA         2.5 4  
XI F         2.5 4  
XII NCh 47 9.5 20 10.5 2     -8.5
XIII PrN       0.25    
XIV NP   0.75     ms
XII–XIV N       10.5 3     NA
XV S2b 9.25 9.5 0.25 3 2.75 2 -2.5
XVI S3   1.5 3
VII S1         4 2.75 2 -2.75
VIII + XV S2       0.25 4 2.75 2 -2.5
XVI S3           1.5 3  
VII+VIII+XV PS       0.25 8 5.5 4 -5.25
VII+VIII+XV+XVI RS       0.25 8 5.5 4 -5.25
IX–XI FS       2.25   2.5 4  
  S       2.5 9.5 7 5.5 -7
XVIIa ECh1 20 22.5 2.5 5 it.    
XVIIb ECh2 na     ms
XVIIc TXT   na     ok
XVIId PRG   na    
XVII ECh       2.5 1.5     -1
XVIIIa EML1   na    
XVIIIb EML2 na    
XIX AL 1.25 2.25 2.75 1.25
XVIII–XIX Out         1.25 2.25 2.75 1.25
XX JR   0.25     ms
XXI PrB      
I + XIV SLS       8.5 7.75 6.75 6.25 -0.75
I SL 22.5 7 6 5.5
 
incl. minuscule LT MCh 4
13.5
-1