D   a   y       L   o   g
Monday 28. augusta 2006
Act. No. Activity nb Began Ended Length prescribed Bonus / Deficit
ideal less least
I SL F 1 7 6 7 6 5.5 1
II EX   0.75     ms
III MCh 47 7 10 1.25 1.25     ok
II–III M       1.25 2     NA
IV FL   0.25    
V PrM       0.25    
VI QU   0.5    
IV–VI US         1     NA
VII S1 4 2.75 2 ms
VIII S2a 1    
IX FP   15 15.5 0.5   2.5 4 -0.5
X FA         2.5 4  
XI F   10 15 5   2.5 4 -1
XII NCh 15.5 23.25 7.75 2     -5.75
XIII PrN       0.25    
XIV NP   0.75     ms
XII–XIV N       7.75 3     NA
XV S2b 3 2.75 2 ms
XVI S3 47 7.25 27.25 5.75   1.5 3 -2.75
VII S1         4 2.75 2 -2
VIII + XV S2         4 2.75 2 -2
XVI S3       5.75   1.5 3 -2.75
VII+VIII+XV PS         8 5.5 4 -4
VII+VIII+XV+XVI RS       5.75 8 5.5 4 1.75
IX–XI FS       5.5   2.5 4 -1.5
  S       6.25 9.5 7 5.5 -3.25
XVIIa ECh1 5 it.    
XVIIb ECh2 na     ms
XVIIc TXT   na     ok
XVIId PRG   na    
XVII ECh         1.5     1.5
XVIIIa EML1 27.25 27.5 0.25 na    
XVIIIb EML2 na    
XIX AL 1.25 2.25 2.75 1.25
XVIII–XIX Out       0.25 1.25 2.25 2.75 1
XX JR   0.25     ms
XXI PrB      
I + XIV SLS       6 7.75 6.75 6.25 1.75
I SL 27.5 7 6 5.5
 
7.25 9 9 23.25 MCh 4
9
-1