D   a   y       L   o   g
Wednesday 30. augusta 2006
Act. No. Activity nb Began Ended Length prescribed Bonus / Deficit
ideal less least
I SL -0.75 9.25 10 7 6 5.5 -3
II EX   0.75     ms
III MCh 47 9.25 12.5 2 1.25     -0.75
II–III M       2 2     NA
IV FL   0.25    
V PrM       0.25    
VI QU   0.5    
IV–VI US         1     NA
VII S1 4 2.75 2 ms
VIII S2a 1    
IX FP   10 11.25 1.25   2.5 4  
X FA         2.5 4  
XI F         2.5 4  
XII NCh 16 24.5 8.5 2     -6.5
XIII PrN       0.25    
XIV NP   0.75     ms
XII–XIV N       8.5 3     NA
XV S2b 3 2.75 2 ms
XVI S3 13.5 16 2.5   1.5 3 0.5
VII S1         4 2.75 2 -2
VIII + XV S2         4 2.75 2 -2
XVI S3       2.5   1.5 3 0.5
VII+VIII+XV PS         8 5.5 4 -4
VII+VIII+XV+XVI RS       2.5 8 5.5 4 -3
IX–XI FS       1.25   2.5 4  
  S       3.75 9.5 7 5.5 -5.75
XVIIa ECh1 5 it.    
XVIIb ECh2 na     ms
XVIIc TXT   na     ms
XVIId PRG   na    
XVII ECh         1.5     1.5
XVIIIa EML1 12.5 13.5 1 na    
XVIIIb EML2 na    
XIX AL 1.25 2.25 2.75 1.25
XVIII–XIX Out       1 1.25 2.25 2.75 0.25
XX JR   0.25     ms
XXI PrB      
I + XIV SLS       10 7.75 6.75 6.25 -2.25
I SL 24.5 7 6 5.5
 
10 11.25 MCh 4
10.5
-1