D   a   y       L   o   g
Saturday 2. septembra 2006
Act. No. Activity nb Began Ended Length prescribed Bonus / Deficit
ideal less least
I SL 9.5 9.5 7 6 5.5 -2.5
II EX   0.75     ms
III MCh 9.5 12 2.5 1.25     -1.25
II–III M       2.5 2     NA
IV FL   0.25    
V PrM       0.25    
VI QU   0.5    
IV–VI US         1     NA
VII S1 4 2.75 2 ms
VIII S2a 1    
IX FP         2.5 4  
X FA         2.5 4  
XI F         2.5 4  
XII NCh 2     ms
XIII PrN       0.25    
XIV NP   0.75     ms
XII–XIV N         3     NA
XV S2b 3 2.75 2 ms
XVI S3 13 20 7   1.5 3 -4
VII S1         4 2.75 2 -2
VIII + XV S2         4 2.75 2 -2
XVI S3       7   1.5 3 -4
VII+VIII+XV PS         8 5.5 4 -4
VII+VIII+XV+XVI RS       7 8 5.5 4 -1
IX–XI FS           2.5 4  
  S       7 9.5 7 5.5 -2.5
XVIIa ECh1 20 25.5 5.5 5 it.    
XVIIb ECh2 na    
XVIIc TXT   na    
XVIId PRG   na    
XVII ECh       5.5 1.5     -4
XVIIIa EML1   na    
XVIIIb EML2 na    
XIX AL 1.25 2.25 2.75 1.25
XVIII–XIX Out         1.25 2.25 2.75 1.25
XX JR   0.25     ms
XXI PrB      
I + XIV SLS       9.5 7.75 6.75 6.25 -1.75
I SL 25.5 7 6 5.5
 
MCh 4
8