D   a   y       L   o   g
Monday 4. septembra 2006
Act. No. Activity nb Began Ended Length prescribed Bonus / Deficit
ideal less least
I SL F 4.25 7.5 3.25 7 6 5.5 3.75
II EX   0.75     ms
III MCh 7.5 8.5 1 1.25     0.25
II–III M       1 2     NA
IV FL   0.25    
V PrM       0.25    
VI QU   0.5    
IV–VI US         1     NA
VII S1 4 2.75 2 ms
VIII S2a 1    
IX FP 47 8.5 12.5 3.75   2.5 4  
X FA         2.5 4  
XI F   15 17 2   2.5 4 -1.75
XII NCh 12.5 15 2.5 2     -0.5
XIII PrN       0.25    
XIV NP F 8.75 19 2.25 0.75     -1.5
XII–XIV N       4.75 3     NA
XV S2b 3 2.75 2 ms
XVI S3   1.5 3
VII S1         4 2.75 2 -2
VIII + XV S2         4 2.75 2 -2
XVI S3           1.5 3  
VII+VIII+XV PS         8 5.5 4 -4
VII+VIII+XV+XVI RS         8 5.5 4 -4
IX–XI FS       5.75   2.5 4 -1.75
  S       3.75 9.5 7 5.5 -5.75
XVIIa ECh1 19 21.5 2.5 5 it.    
XVIIb ECh2 na    
XVIIc TXT   na    
XVIId PRG   na    
XVII ECh       2.5 1.5     -1
XVIIIa EML1 21.5 23.5 2 na    
XVIIIb EML2 na    
XIX AL 1.25 2.25 2.75 1.25
XVIII–XIX Out       2 1.25 2.25 2.75 -0.75
XX JR   0.25     ms
XXI PrB      
I + XIV SLS       5.5 7.75 6.75 6.25 2.25
I SL 23.5 7 6 5.5
 
8.75 9 MCh 4
9 17 6
-1