D   a   y       L   o   g
Tuesday 5. septembra 2006
Act. No. Activity nb Began Ended Length prescribed Bonus / Deficit
ideal less least
I SL F -0.5 5 5.5 7 6 5.5 1.5
II EX   0.75     ms
III MCh 5 7 2 1.25     -0.75
II–III M       2 2     NA
IV FL   0.25    
V PrM       0.25    
VI QU   0.5    
IV–VI US         1     NA
VII S1 4 2.75 2 ms
VIII S2a 1    
IX FP 47 7 25 7   2.5 4 -3
X FA         2.5 4  
XI F         2.5 4  
XII NCh 14 15.5 1.5 2     0.5
XIII PrN       0.25    
XIV NP 49 9 18.75 3.5 0.75     -2.75
XII–XIV N       5 3     NA
XV S2b 3 2.75 2 ms
XVI S3 19.25 20.25 1   1.5 3
VII S1         4 2.75 2 -2
VIII + XV S2         4 2.75 2 -2
XVI S3       1   1.5 3  
VII+VIII+XV PS         8 5.5 4 -4
VII+VIII+XV+XVI RS       1 8 5.5 4 -3
IX–XI FS       7   2.5 4 -3
  S       8 9.5 7 5.5 -1.5
XVIIa ECh1 20.25 22.5 2.25 5 it.    
XVIIb ECh2 na    
XVIIc TXT   na    
XVIId PRG   na    
XVII ECh       2.25 1.5     -0.75
XVIIIa EML1 12.5 14 1.5 na    
XVIIIb EML2 22.5 23.75 1.25 na    
XIX AL 1.25 2.25 2.75 1.25
XVIII–XIX Out       2.75 1.25 2.25 2.75 -1.5
XX JR   0.25     ms
XXI PrB      
I + XIV SLS       9 7.75 6.75 6.25 -1.25
I SL 25 7 6 5.5
 
9 9.25 12.5 18.75 19.25 23.75 MCh 4
5.75
9.25 15.5 -1