D   a   y       L   o   g
Wednesday 6. septembra 2006
Act. No. Activity nb Began Ended Length prescribed Bonus / Deficit
ideal less least
I SL F 1 6.25 5.25 7 6 5.5 1.75
II EX   0.75     ms
III MCh 6.25 6.5 0.25 1.25     1
II–III M       0.25 2     NA
IV FL   0.25    
V PrM       0.25    
VI QU   0.5    
IV–VI US         1     NA
VII S1 4 2.75 2 ms
VIII S2a 1    
IX FP 47 6.5 20.5 6.75   2.5 4 -2.75
X FA         2.5 4  
XI F   14.5 18 3.5   2.5 4 -3.5
XII NCh 12.5 14.5 2 2     ok
XIII PrN       0.25    
XIV NP F 7 7.25 0.25 0.75     0.5
XII–XIV N       2.25 3     NA
XV S2b 3 2.75 2 ms
XVI S3 23 25.25 2.25   1.5 3 0.75
VII S1         4 2.75 2 -2
VIII + XV S2         4 2.75 2 -2
XVI S3       2.25   1.5 3 0.75
VII+VIII+XV PS         8 5.5 4 -4
VII+VIII+XV+XVI RS       2.25 8 5.5 4 -1.75
IX–XI FS       10.25   2.5 4 -6.25
  S       9 9.5 7 5.5 -0.5
XVIIa ECh1 18 19.5 1.5 5 it.    
XVIIb ECh2 22 23 1 na    
XVIIc TXT   na    
XVIId PRG   na    
XVII ECh       2.5 1.5     -1
XVIIIa EML1 20.5 22 1.5 na    
XVIIIb EML2 na    
XIX AL 1.25 2.25 2.75 1.25
XVIII–XIX Out       1.5 1.25 2.25 2.75 -0.25
XX JR   0.25     ms
XXI PrB      
I + XIV SLS       5.5 7.75 6.75 6.25 2.25
I SL 25.25 7 6 5.5
 
7 7.25 12.5 19.5 MCh 4
4.75
-1