D   a   y       L   o   g
Sunday 10. septembra 2006
Act. No. Activity nb Began Ended Length prescribed Bonus / Deficit
ideal less least
I SL 6.5 10.5 4 7 6 5.5 3
II EX   0.75     ms
III MCh 47 10.5 11.25 0.75 1.25     0.5
II–III M       0.75 2     NA
IV FL   0.25    
V PrM       0.25    
VI QU   0.5    
IV–VI US         1     NA
VII S1 4 2.75 2 ms
VIII S2a 1    
IX FP         2.5 4  
X FA         2.5 4  
XI F         2.5 4  
XII NCh 2     ms
XIII PrN       0.25    
XIV NP 11.25 14.25 3 0.75     -2.25
XII–XIV N       3 3     NA
XV S2b 3 2.75 2 ms
XVI S3 48 14.25 25.25 8.75   1.5 3 -5.75
VII S1         4 2.75 2 -2
VIII + XV S2         4 2.75 2 -2
XVI S3       8.75   1.5 3 -5.75
VII+VIII+XV PS         8 5.5 4 -4
VII+VIII+XV+XVI RS       8.75 8 5.5 4 0.75
IX–XI FS           2.5 4  
  S       8.75 9.5 7 5.5 -0.75
XVIIa ECh1 20 21.5 1.5 5 it.    
XVIIb ECh2 na    
XVIIc TXT   na    
XVIId PRG   na    
XVII ECh       1.5 1.5     ok
XVIIIa EML1 19.25 20 0.75 na    
XVIIIb EML2 na    
XIX AL 1.25 2.25 2.75 1.25
XVIII–XIX Out       0.75 1.25 2.25 2.75 0.5
XX JR   0.25     ms
XXI PrB      
I + XIV SLS       7 7.75 6.75 6.25 0.75
I SL 25.25 7 6 5.5
 
incl. short LT MCh 4
19.25 21.5 2.25
-1