D   a   y       L   o   g
D   a   y       L   o   g
Thursday 14. septembra 2006
Act. No. Activity nb Began Ended Length prescribed Bonus / Deficit
ideal less least
I SL -1.75 9 10.75 7 6 5.5 -3.75
II EX   0.75     ms
III MCh 9.75 11.5 1.75 1.25     -0.5
II–III M       1.75 2     NA
IV FL   0.25    
V PrM       0.25    
VI QU   0.5    
IV–VI US         1     NA
VII S1 4 2.75 2 ms
VIII S2a 1    
IX FP 48 11.5 19 6.25   2.5 4 -2.25
X FA         2.5 4  
XI F         2.5 4  
XII NCh 13.75 15 1.25 2     0.75
XIII PrN       0.25    
XIV NP   0.75     ms
XII–XIV N       1.25 3     NA
XV S2b 3 2.75 2 ms
XVI S3   1.5 3
VII S1         4 2.75 2 -2
VIII + XV S2         4 2.75 2 -2
XVI S3           1.5 3  
VII+VIII+XV PS         8 5.5 4 -4
VII+VIII+XV+XVI RS         8 5.5 4 -4
IX–XI FS       6.25   2.5 4 -2.25
  S       6.25 9.5 7 5.5 -3.25
XVIIa ECh1 20.25 22 1.75 5 it.    
XVIIb ECh2 na    
XVIIc TXT   na    
XVIId PRG   na    
XVII ECh       1.75 1.5     -0.25
XVIIIa EML1 9 9.75 0.75 na    
XVIIIb EML2 47 19 23 2.25 na    
XIX AL 1.25 2.25 2.75 1.25
XVIII–XIX Out       3 1.25 2.25 2.75 -1.75
XX JR   0.25     ms
XXI PrB      
I + XIV SLS       10.75 7.75 6.75 6.25 -3
I SL 23 7 6 5.5
 
20.25 22 MCh 4
13.75 15 4.75
-1