D   a   y       L   o   g
Saturday 16. septembra 2006
Act. No. Activity nb Began Ended Length prescribed Bonus / Deficit
ideal less least
I SL -2.5 8 10.5 7 6 5.5 -3.5
II EX   0.75     ms
III MCh 47 8 12 1.25 1.25     ok
II–III M       1.25 2     NA
IV FL   0.25    
V PrM       0.25    
VI QU   0.5    
IV–VI US         1     NA
VII S1 4 2.75 2 ms
VIII S2a 1    
IX FP   9.5 11 1.5   2.5 4  
X FA         2.5 4  
XI F         2.5 4  
XII NCh 14.25 17.5 3.25 2     -1.25
XIII PrN       0.25    
XIV NP 17.5 22 4.5 0.75     -3.75
XII–XIV N       7.75 3     NA
XV S2b 3 2.75 2 ms
XVI S3 12 14.25 2.25   1.5 3 0.75
VII S1         4 2.75 2 -2
VIII + XV S2         4 2.75 2 -2
XVI S3       2.25   1.5 3 0.75
VII+VIII+XV PS         8 5.5 4 -4
VII+VIII+XV+XVI RS       2.25 8 5.5 4 -3.25
IX–XI FS       1.5   2.5 4  
  S       3.75 9.5 7 5.5 -5.75
XVIIa ECh1 5 it.    
XVIIb ECh2 na    
XVIIc TXT   na    
XVIId PRG   na    
XVII ECh         1.5     1.5
XVIIIa EML1 8.25 9.5 1.25 na    
XVIIIb EML2 22 23.75 1.75 na    
XIX AL 1.25 2.25 2.75 1.25
XVIII–XIX Out       3 1.25 2.25 2.75 -1.75
XX JR   0.25     ms
XXI PrB      
I + XIV SLS       15 7.75 6.75 6.25 -7.25
I SL 23.75 7 6 5.5
 
8.25 11 MCh 4
4.5
-1