D   a   y       L   o   g
Sunday 24. septembra 2006
Act. No. Activity nb Began Ended Length prescribed Bonus / Deficit
ideal less least
I SL -3.5 7.75 11.25 7 6 5.5 -4.25
II EX 9 9.75 0.75 0.75     ok
III MCh 47 7.75 11.25 2.75 1.25     -1.5
II–III M       3.5 2     -1.5
IV FL   0.25    
V PrM       0.25    
VI QU   0.5    
IV–VI US         1     NA
VII S1 4 2.75 2 ms
VIII S2a 11.25 11.5 0.25 1     -0.75
IX FP         2.5 4  
X FA         2.5 4  
XI F         2.5 4  
XII NCh 13 17.5 4.5 2     -2.5
XIII PrN       0.25    
XIV NP 48 11.5 19 2 0.75     -1.25
XII–XIV N       6.5 3     NA
XV S2b 47 17.5 20.75 2.75 3 2.75 2 -0.25
XVI S3   1.5 3
VII S1         4 2.75 2 -4
VIII + XV S2       3 4 2.75 2 -1
XVI S3           1.5 3  
VII+VIII+XV PS       3 8 5.5 4 -5
VII+VIII+XV+XVI RS       3 8 5.5 4 -5
IX–XI FS           2.5 4  
  S       3 9.5 7 5.5 -6.5
XVIIa ECh1 5 it.    
XVIIb ECh2 na    
XVIIc TXT   na    
XVIId PRG   na    
XVII ECh         1.5     1.5
XVIIIa EML1   na    
XVIIIb EML2 na    
XIX AL 1.25 2.25 2.75 1.25
XVIII–XIX Out         1.25 2.25 2.75 1.25
XX JR   0.25     ms
XXI PrB      
I + XIV SLS       13.25 7.75 6.75 6.25 -5.5
I SL 20.75 7 6 5.5
 
9 9.75 incl. LT 18.5 19 MCh 4
13 18.5 1st Part = F 8
-1