D   a   y       L   o   g
Tuesday 26. septembra 2006
Act. No. Activity nb Began Ended Length prescribed Bonus / Deficit
ideal less least
I SL -1.5 8.5 10 7 6 5.5 -3
II EX   0.75     ms
III MCh 8.5 9.25 0.75 1.25     0.5
II–III M       0.75 2     NA
IV FL   0.25    
V PrM       0.25    
VI QU   0.5    
IV–VI US         1     NA
VII S1 4 2.75 2 ms
VIII S2a 1    
IX FP 48 10.5 18.5 4   2.5 4  
X FA         2.5 4  
XI F         2.5 4  
XII NCh 12.75 15 2.25 2     -0.25
XIII PrN       0.25    
XIV NP   0.75     ms
XII–XIV N       2.25 3     NA
XV S2b 3 2.75 2 ms
XVI S3   1.5 3
VII S1         4 2.75 2 -2
VIII + XV S2         4 2.75 2 -2
XVI S3           1.5 3  
VII+VIII+XV PS         8 5.5 4 -4
VII+VIII+XV+XVI RS         8 5.5 4 -4
IX–XI FS       4   2.5 4  
  S       4 9.5 7 5.5 -5.5
XVIIa ECh1 20 22.5 2.5 5 it.    
XVIIb ECh2 na    
XVIIc TXT   na    
XVIId PRG   na    
XVII ECh       2.5 1.5     -1
XVIIIa EML1 47 9.25 16.5 3 na    
XVIIIb EML2 47 18.5 23 2 na    
XIX AL 1.25 2.25 2.75 1.25
XVIII–XIX Out       5 1.25 2.25 2.75 -3.75
XX JR   0.25     ms
XXI PrB      
I + XIV SLS       10 7.75 6.75 6.25 -2.25
I SL 23 7 6 5.5
 
10.5 12.5 12.75 15 20 22.5 MCh 4
12.5 16.5 5.5
-1