D   a   y       L   o   g
Saturday 30. septembra 2006
Act. No. Activity nb Began Ended Length prescribed Bonus / Deficit
ideal less least
I SL -1.25 9 10.25 7 6 5.5 -3.25
II EX   0.75     ms
III MCh 9 14 5 1.25     -3.75
II–III M       5 2     NA
IV FL   0.25    
V PrM       0.25    
VI QU   0.5    
IV–VI US         1     NA
VII S1 4 2.75 2 ms
VIII S2a 1    
IX FP         2.5 4  
X FA         2.5 4  
XI F   14 17.5 3.5   2.5 4  
XII NCh 17.5 19.5 2 2     ok
XIII PrN       0.25    
XIV NP   0.75     ms
XII–XIV N       2 3     NA
XV S2b 3 2.75 2 ms
XVI S3   1.5 3
VII S1         4 2.75 2 -2
VIII + XV S2         4 2.75 2 -2
XVI S3           1.5 3  
VII+VIII+XV PS         8 5.5 4 -4
VII+VIII+XV+XVI RS         8 5.5 4 -4
IX–XI FS       3.5   2.5 4  
  S         9.5 7 5.5 -9.5
XVIIa ECh1 20 21 1 5 it.    
XVIIb ECh2 na    
XVIIc TXT   na    
XVIId PRG   na    
XVII ECh       1 1.5     0.5
XVIIIa EML1 21 24 3 na    
XVIIIb EML2 na    
XIX AL 19.5 20 0.5 1.25 2.25 2.75 0.75
XVIII–XIX Out       3.5 1.25 2.25 2.75 -2.25
XX JR   0.25     ms
XXI PrB      
I + XIV SLS       10.25 7.75 6.75 6.25 -2.5
I SL 24 7 6 5.5
 
MCh 4
8
-1