D   a   y       L   o   g
Monday 9. októbra 2006
Act. No. Activity nb Began Ended Length prescribed Bonus / Deficit
ideal less least
I SL -2 5.75 7.75 7 6 5.5 -0.75
II EX   0.75     ms
III MCh 47 5.75 10.75 3.5 1.25     -2.25
II–III M       3.5 2     NA
IV FL   0.25    
V PrM       0.25    
VI QU   0.5    
IV–VI US         1     NA
VII S1 4 2.75 2 ms
VIII S2a 1    
IX FP 48 8 18 4.25   2.5 4 -0.25
X FA         2.5 4  
XI F         2.5 4  
XII NCh 12.75 16.5 3.75 2     -1.75
XIII PrN       0.25    
XIV NP   0.75     ms
XII–XIV N       3.75 3     NA
XV S2b 3 2.75 2 ms
XVI S3 49 11.75 21.25 4   1.5 3 -1
VII S1         4 2.75 2 -2
VIII + XV S2         4 2.75 2 -2
XVI S3       4   1.5 3 -1
VII+VIII+XV PS         8 5.5 4 -4
VII+VIII+XV+XVI RS       4 8 5.5 4  
IX–XI FS       4.25   2.5 4 -0.25
  S       8.25 9.5 7 5.5 -1.25
XVIIa ECh1 21.25 22.75 1.5 5 it.    
XVIIb ECh2 na    
XVIIc TXT   na     ms
XVIId PRG   na    
XVII ECh       1.5 1.5     ok
XVIIIa EML1 22.75 27.5 4.75 na    
XVIIIb EML2 na    
XIX AL 1.25 2.25 2.75 1.25
XVIII–XIX Out       4.75 1.25 2.25 2.75 -3.5
XX JR   0.25     ms
XXI PrB      
I + XIV SLS       7.75 7.75 6.75 6.25  
I SL 27.5 7 6 5.5
 
8 9.5 MCh 4
9.5 10.75 11.75 12.5 12.75 16.5 8.75
12.5 18 2 Standards Theory in Forum; plan.vdp.sk