D   a   y       L   o   g
Wednesday 8. novembra 2006
Act. No. Activity nb Began Ended Length prescribed Bonus / Deficit
ideal less least
I SL F -0.5 7.25 7.75 7 6 5.5 -0.75
II EX   0.75     ms
III MCh 47 7.25 15 4 1.25     -2.75
II–III M       4 2     NA
IV FL   0.25    
V PrM       0.25    
VI QU   0.5    
IV–VI US         1     NA
VII S1 4 2.75 2 ms
VIII S2a 1    
IX FP   8.5 9 0.5   2.5 4  
X FA   18.5 19.5 1   2.5 4 -1
XI F   15 18.5 3.5   2.5 4  
XII NCh 2     ms
XIII PrN       0.25    
XIV NP   0.75     ms
XII–XIV N         3     NA
XV S2b 3 2.75 2 ms
XVI S3   1.5 3
VII S1         4 2.75 2 -2
VIII + XV S2         4 2.75 2 -2
XVI S3           1.5 3  
VII+VIII+XV PS         8 5.5 4 -4
VII+VIII+XV+XVI RS         8 5.5 4 -4
IX–XI FS       5   2.5 4 -1
  S       1.5 9.5 7 5.5 -8
XVIIa ECh1 19.5 23 3.5 5 it.    
XVIIb ECh2 na    
XVIIc TXT   na     ok
XVIId PRG   na    
XVII ECh       3.5 1.5     -2
XVIIIa EML1 47 7.75 11.5 3.25 na    
XVIIIb EML2 23 24 1 na    
XIX AL 1.25 2.25 2.75 1.25
XVIII–XIX Out       4.25 1.25 2.25 2.75 -3
XX JR   0.25     ms
XXI PrB      
I + XIV SLS       7.75 7.75 6.75 6.25  
I SL 24 7 6 5.5
 
7.75 11.5 8.5 9 MCh 4
7.5
-1