D   a   y       L   o   g
Monday 13. novembra 2006
Act. No. Activity nb Began Ended Length prescribed Bonus / Deficit
ideal less least
I SL 47 -1.75 6.75 6.5 7 6 5.5 0.5
II EX 6.75 7.5 0.75 0.75     ok
III MCh 49 7.5 10 2 1.25     -0.75
II–III M       2.75 2     -0.75
IV FL 8.5 8.75 0.25 0.25     ok
V PrM   8.75 9 0.25 0.25     ok
VI QU 10.5 11 0.5 0.5     ok
IV–VI US       1 1     ok
VII S1 4 2.75 2 ms
VIII S2a 1    
IX FP 47 -0.5 12.25 2.75   2.5 4  
X FA         2.5 4  
XI F   14 16.5 2.5   2.5 4 -1.25
XII NCh 13.25 14 0.75 2     1.25
XIII PrN   16.5 16.75 0.25 0.25     ok
XIV NP   0.75     ms
XII–XIV N       1 3     NA
XV S2b 3 2.75 2 ms
XVI S3 49 10 13.25 1.5   1.5 3
VII S1         4 2.75 2 -2
VIII + XV S2         4 2.75 2 -2
XVI S3       1.5   1.5 3  
VII+VIII+XV PS         8 5.5 4 -4
VII+VIII+XV+XVI RS       1.5 8 5.5 4 -2.5
IX–XI FS       5.25   2.5 4 -1.25
  S       5.5 9.5 7 5.5 -4
XVIIa ECh1 16.75 19.5 2.75 5 it.    
XVIIb ECh2 na    
XVIIc TXT   na     ok
XVIId PRG   na    
XVII ECh       2.75 1.5     -1.25
XVIIIa EML1 -1 -0.5 0.5 na    
XVIIIb EML2 19.5 21.5 2 na    
XIX AL 1.25 2.25 2.75 1.25
XVIII–XIX Out       2.5 1.25 2.25 2.75 -1.25
XX JR   0.25     ms
XXI PrB      
I + XIV SLS       6.5 7.75 6.75 6.25 1.25
I SL 21.5 7 6 5.5
 
-1 1 1 11 MCh 4
6.25
8.5 9 10.5 12.25 -1