D   a   y       L   o   g
Thursday 16. novembra 2006
Act. No. Activity nb Began Ended Length prescribed Bonus / Deficit
ideal less least
I SL F 1.75 7.5 5.75 7 6 5.5 1.25
II EX   0.75     ms
III MCh 9.5 10 0.5 1.25     0.75
II–III M       0.5 2     NA
IV FL   0.25     ms
V PrM       0.25     ms
VI QU   0.5     ms
IV–VI US         1     ms
VII S1 4 2.75 2 ms
VIII S2a 1    
IX FP 49 7.75 17.75 2.25   2.5 4  
X FA         2.5 4  
XI F         2.5 4  
XII NCh 47 12 17 5 2     -3
XIII PrN       0.25     ms
XIV NP F 19 19.5 0.5 0.75     0.25
XII–XIV N       5.5 3     NA
XV S2b 3 2.75 2 ms
XVI S3   1.5 3
VII S1         4 2.75 2 -2.75
VIII + XV S2         4 2.75 2 -2.75
XVI S3           1.5 3  
VII+VIII+XV PS         8 5.5 4 -5.5
VII+VIII+XV+XVI RS         8 5.5 4 -5.5
IX–XI FS       2.25   2.5 4  
  S       2.5 9.5 7 5.5 -7
XVIIa ECh1 17.75 19 1.25 5 it.    
XVIIb ECh2 19.5 21.75 2.25 na    
XVIIc TXT   na     ok
XVIId PRG   na    
XVII ECh       3.5 1.5     -2
XVIIIa EML1 47 7.5 12 2.5 na    
XVIIIb EML2 22 25 3 na    
XIX AL 1.25 2.25 2.75 1.25
XVIII–XIX Out       5.5 1.25 2.25 2.75 -4.25
XX JR   0.25     ms
XXI PrB   21.75 22 0.25
I + XIV SLS       6.25 7.75 6.75 6.25 1.5
I SL 25 7 6 5.5
 
7.75 8 9.5 11.25 NCh = incl. DN, LT MCh 4
9
8 10 11.25 17 -1