D   a   y       L   o   g
Friday 24. novembra 2006
Act. No. Activity nb Began Ended Length prescribed Bonus / Deficit
ideal less least
I SL 1 9.5 8.5 7 6 5.5 -1.5
II EX   0.75     ms
III MCh 10.5 13.25 2.75 1.25     -1.5
II–III M       2.75 2     NA
IV FL   0.25     ms
V PrM       0.25     ms
VI QU   0.5     ms
IV–VI US         1     ms
VII S1 4 2.75 2 ms
VIII S2a 1    
IX FP   14.5 15 0.5   2.5 4  
X FA         2.5 4  
XI F         2.5 4  
XII NCh 13.25 14.5 1.25 2     0.75
XIII PrN       0.25     ms
XIV NP 16.25 19.75 3.5 0.75     -2.75
XII–XIV N       4.75 3     NA
XV S2b 3 2.75 2 ms
XVI S3   1.5 3
VII S1         4 2.75 2 -4
VIII + XV S2         4 2.75 2 -4
XVI S3           1.5 3  
VII+VIII+XV PS         8 5.5 4 -8
VII+VIII+XV+XVI RS         8 5.5 4 -8
IX–XI FS       0.5   2.5 4  
  S       0.5 9.5 7 5.5 -9
XVIIa ECh1 20.25 22.5 2.25 5 it.    
XVIIb ECh2 na    
XVIIc TXT   na     ok
XVIId PRG   na    
XVII ECh       2.25 1.5     -0.75
XVIIIa EML1 9.5 10.5 1 na    
XVIIIb EML2 47 15 23.25 2.5 na    
XIX AL 1.25 2.25 2.75 1.25
XVIII–XIX Out       3.5 1.25 2.25 2.75 -2.25
XX JR   0.25     ms
XXI PrB      
I + XIV SLS       12 7.75 6.75 6.25 -4.25
I SL 23.25 7 6 5.5
 
16.25 19.75 20.25 22.5 MCh 4
6.25
-1