D   a   y       L   o   g
Tuesday 28. novembra 2006
Act. No. Activity nb Began Ended Length prescribed Bonus / Deficit
ideal less least
I SL F -0.5 6.5 7 7 6 5.5 ok
II EX   0.75     ms
III MCh 6.5 7.5 1 1.25     0.25
II–III M       1 2     NA
IV FL   0.25     ms
V PrM       0.25     ms
VI QU   0.5     ms
IV–VI US         1     ms
VII S1 4 2.75 2 ms
VIII S2a 1    
IX FP 47 9.5 16.25 3.5   2.5 4  
X FA         2.5 4  
XI F         2.5 4  
XII NCh 13.5 15.5 2 2     ok
XIII PrN       0.25     ms
XIV NP 48 10.5 20.5 1 0.75     -0.25
XII–XIV N       3 3     NA
XV S2b 12.5 13 0.5 3 2.75 2 -1.5
XVI S3   1.5 3
VII S1         4 2.75 2 -2
VIII + XV S2       0.5 4 2.75 2 -1.5
XVI S3           1.5 3  
VII+VIII+XV PS       0.5 8 5.5 4 -3.5
VII+VIII+XV+XVI RS       0.5 8 5.5 4 -3.5
IX–XI FS       3.5   2.5 4  
  S       4 9.5 7 5.5 -5.5
XVIIa ECh1 18.75 19.75 1 5 it.    
XVIIb ECh2 21 23 2 na    
XVIIc TXT   na     ok
XVIId PRG   na    
XVII ECh       3 1.5     -1.5
XVIIIa EML1 49 7.5 13.5 2.5 na    
XVIIIb EML2 49 16.25 21 3 na    
XIX AL 1.25 2.25 2.75 1.25
XVIII–XIX Out       5.5 1.25 2.25 2.75 -4.25
XX JR   0.25     ms
XXI PrB      
I + XIV SLS       8 7.75 6.75 6.25 -0.25
I SL 23 7 6 5.5
 
10.5 10.75 12.5 15.5 MCh 4
10.75 19.75 1st Part = F 6
9.5 13 18.75 20.5 -1