D   a   y       L   o   g
Thursday 30. novembra 2006
Act. No. Activity nb Began Ended Length prescribed Bonus / Deficit
ideal less least
I SL F -2.5 5.75 8.25 7 6 5.5 -1.25
II EX   0.75     ms
III MCh 5.75 6.75 1 1.25     0.25
II–III M       1 2     NA
IV FL   0.25     ms
V PrM       0.25     ms
VI QU   0.5     ms
IV–VI US         1     ms
VII S1 4 2.75 2 ms
VIII S2a 1    
IX FP 47 6.75 16.25 7   2.5 4 -3
X FA         2.5 4  
XI F         2.5 4  
XII NCh 13 15.5 2.5 2     -0.5
XIII PrN       0.25     ms
XIV NP 16.75 19 2.25 0.75     -1.5
XII–XIV N       4.75 3     NA
XV S2b 3 2.75 2 ms
XVI S3   1.5 3
VII S1         4 2.75 2 -2
VIII + XV S2         4 2.75 2 -2
XVI S3           1.5 3  
VII+VIII+XV PS         8 5.5 4 -4
VII+VIII+XV+XVI RS         8 5.5 4 -4
IX–XI FS       7   2.5 4 -3
  S       7 9.5 7 5.5 -2.5
XVIIa ECh1 20 22.25 2.25 5 it.    
XVIIb ECh2 na    
XVIIc TXT   na     ok
XVIId PRG   na    
XVII ECh       2.25 1.5     -0.75
XVIIIa EML1 16.25 16.75 0.5 na    
XVIIIb EML2 47 19 23 1.5 na    
XIX AL 1.25 2.25 2.75 1.25
XVIII–XIX Out       2 1.25 2.25 2.75 -0.75
XX JR   0.25     ms
XXI PrB      
I + XIV SLS       10.5 7.75 6.75 6.25 -2.75
I SL 23 7 6 5.5
 
13 15.5 20 22.5 MCh 4
5.75
-1