D   a   y       L   o   g
Thursday 7. decembra 2006
Act. No. Activity nb Began Ended Length prescribed Bonus / Deficit
ideal less least
I SL F 4.75 7.5 2.75 7 6 5.5 4.25
II EX   0.75     ms
III MCh 10.5 11.25 0.75 1.25     0.5
II–III M       0.75 2     NA
IV FL   0.25     ms
V PrM       0.25     ms
VI QU   0.5     ms
IV–VI US         1     ms
VII S1 4 2.75 2 ms
VIII S2a 1    
IX FP 48 8.75 20 6.75   2.5 4 -2.75
X FA         2.5 4  
XI F         2.5 4  
XII NCh 2     ms
XIII PrN       0.25     ms
XIV NP 47 11.25 18 2.5 0.75     -1.75
XII–XIV N       2.5 3     NA
XV S2b 3 2.75 2 ms
XVI S3   1.5 3
VII S1         4 2.75 2 -2
VIII + XV S2         4 2.75 2 -2
XVI S3           1.5 3  
VII+VIII+XV PS         8 5.5 4 -4
VII+VIII+XV+XVI RS         8 5.5 4 -4
IX–XI FS       6.75   2.5 4 -2.75
  S       6.75 9.5 7 5.5 -2.75
XVIIa ECh1 49 18 19.25 1.25 5 it.    
XVIIb ECh2 49 20.25 23.25 1.5 na    
XVIIc TXT   na     ok
XVIId PRG   na    
XVII ECh       2.75 1.5     -1.25
XVIIIa EML1 7.5 8.75 1.25 na    
XVIIIb EML2 47 20 22.5 1 na    
XIX AL 1.25 2.25 2.75 1.25
XVIII–XIX Out       2.25 1.25 2.25 2.75 -1
XX JR   0.25     ms
XXI PrB       ms
I + XIV SLS       5.25 7.75 6.75 6.25 2.5
I SL 23.25 7 6 5.5
 
20.25 21.75 11.75 16 F MCh 4
10.5 11.75 16 19.25 3.5
0.5 = LT 21.75 22.5 LT -1