D   a   y       L   o   g
D   a   y       L   o   g
Tuesday 2. januára 2007
\
Act. No. Activity nb Began Ended Length prescribed Bonus / Deficit
ideal less least
I SL F 5.25 7.5 2.25 7 6 5.5 4.75
II EX   0.75     ms
IIIa MCh 51 7.75 10.25 1 1.25     0.25
IIIb MCh PF       4 it. Wght  
II–III M       1 2     NA
IV FL   0.25     ms
V PrM       0.25     ms
VI QU   0.5     ms
IV–VI US         1     ms
VII S1 4 2.75 2 ms
VIII S2a 18 20 2 1     1
IXa FD       0 2.5 4  
IXb FP   8 9.5 1.5  
X FA        
XI F        
XII NCh 52 15 18 3 2     -1
XIII PrN       0.25     ms
XIV NP 53 10.25 21.5 6.25 0.75     -5.5
XII–XIV N       9.25 3     NA
XV S2b 23.5 26 2.5 3 2.75 2 -0.5
XVI S3   1.5 3
VII S1         4 2.75 2 -2.75
VIII + XV S2       4.5 4 2.75 2 1.75
XVI S3           1.5 3  
VII+VIII+XV PS       4.5 8 5.5 4 -1
VII+VIII+XV+XVI RS       4.5 8 5.5 4 -1
IX–XI FS       1.5 0 2.5 4  
  S       6 9.5 9.5 9.5 -3.5
XVIIa ECh1 5 it.    
XVIIb ECh2 5.5     4
XVIIc TXT   na     ok
XVIId PRG   na    
XVII ECh         1.5     1.5
XVIIIa EML1 7.5 7.75 0.25 na    
XVIIIb EML2 21.5 23.5 2 na    
XIX AL 1.25 2.25 2.75 1.25
XVIII–XIX Out       2.25 1.25 2.25 2.75 -1
XX JR   0.25     ms
XXI PrB       ms
I + XIV SLS       8.5 7.75 6.75 6.25 -0.75
I SL 26 7 6 5.5
     
WLS in:   out:   in:   out:  
Walks     CleanUps     -1
8 9.5
DN
15 20