D   a   y       L   o   g
D   a   y       L   o   g
Friday 12. januára 2007
\
Act. No. Activity nb Began Ended Length prescribed Bonus / Deficit
ideal less least
I SL F -0.5 8 8.5 7 6 5.5 -1.5
II EX   0.75     ms
IIIa MCh 51 8 11.75 1.25 1.25     ok
IIIb MCh PF       4 it. Wght  
II–III M       1.25 2     NA
IV FL   0.25     ms
V PrM       0.25     ms
VI QU   0.5     ms
IV–VI US         1     ms
VII S1 4 2.75 2 ms
VIII S2a 1    
IXa FD       0 2.5 4  
IXb FP 53 8.5 11.25 2.25  
X FA        
XI F        
XII NCh 53 13 15.5 2.5 2     -0.5
XIII PrN       0.25     ms
XIV NP 18.5 19.5 1 0.75     -0.25
XII–XIV N       3.5 3     NA
XV S2b 22.5 23.5 1 3 2.75 2 -1.75
XVI S3   1.5 3
VII S1         4 2.75 2 -2.75
VIII + XV S2       1 4 2.75 2 -1.75
XVI S3           1.5 3  
VII+VIII+XV PS       1 8 5.5 4 -4.5
VII+VIII+XV+XVI RS       1 8 5.5 4 -4.5
IX–XI FS       2.25 0 2.5 4  
  S       3.25 9.5 9.5 9.5 -6.25
XVIIa ECh1 19.5 22.5 3 5 it.    
XVIIb ECh2 5.5     6.75
XVIIc TXT   na     ms
XVIId PRG   na    
XVII ECh       3 1.5     -1.5
XVIIIa EML1 52 8.25 13 1.5 na    
XVIIIb EML2 15.5 18.5 3 na    
XIX AL 1.25 2.25 2.75 1.25
XVIII–XIX Out       4.5 1.25 2.25 2.75 -3.25
XX JR   0.25     ms
XXI PrB       ms
I + XIV SLS       9.5 7.75 6.75 6.25 -1.75
I SL 23.5 7 6 5.5
     
WLS in:   out:   in:   out:  
Walks     CleanUps     -1
8.25 10 10.5 11.25
8.5 11.75
10 10.5 incl. some LT