D   a   y       L   o   g
D   a   y       L   o   g
Thursday 18. januára 2007
\
Act. No. Activity nb Began Ended Length prescribed Bonus / Deficit
ideal less least
I SL F -2.5 7 9.5 7 6 5.5 -2.5
II EX   0.75     ms
IIIa MCh 51 7 9.5 0.75 1.25     0.5
IIIb MCh PF       4 it. Wght  
II–III M       0.75 2     NA
IV FL   0.25     ms
V PrM       0.25     ms
VI QU   0.5     ms
IV–VI US         1     ms
VII S1 4 2.75 2 ms
VIII S2a 1    
IXa FD       0 2.5 4  
IXb FP   8 9 1  
X FA        
XI F        
XII NCh 52 12.25 25 12.75 2     -10.75
XIII PrN       0.25     ms
XIV NP 9.5 10.75 1.25 0.75     -0.5
XII–XIV N       14 3     NA
XV S2b 3 2.75 2 ms
XVI S3   1.5 3
VII S1         4 2.75 2 -4
VIII + XV S2         4 2.75 2 -4
XVI S3           1.5 3  
VII+VIII+XV PS         8 5.5 4 -8
VII+VIII+XV+XVI RS         8 5.5 4 -8
IX–XI FS       1 0 2.5 4  
  S       1 9.5 9.5 9.5 -8.5
XVIIa ECh1 5 it.    
XVIIb ECh2 5.5     13.5
XVIIc TXT   na     ok
XVIId PRG   na    
XVII ECh         1.5     1.5
XVIIIa EML1 7.25 8 0.75 na    
XVIIIb EML2 10.75 12.25 1.5 na    
XIX AL 1.25 2.25 2.75 1.25
XVIII–XIX Out       2.25 1.25 2.25 2.75 -1
XX JR   0.25     ms
XXI PrB       ms
I + XIV SLS       10.75 7.75 6.75 6.25 -3
I SL 25 7 6 5.5
     
WLS in:   out:   in:   out:  
Walks     CleanUps     -1
7.25 9
incl. DN