D   a   y       L   o   g
D   a   y       L   o   g
Thursday 1. februára 2007
\
Act. No. Activity nb Began Ended Length prescribed Bonus / Deficit
ideal less least
I SL F -1 6 7 7 6 5.5 ok
II EX   0.75     ms
IIIa MCh 52 6.5 7.75 1.25 1.25     ok
IIIb MCh PF       4 it. Wght  
II–III M       1.25 2     NA
IV FL   0.25     ms
V PrM       0.25     ms
VI QU   0.5     ms
IV–VI US         1     ms
VII S1 4 2.75 2 ms
VIII S2a 1    
IXa FD       0 2.5 4  
IXb FP 53 8 18.75 5 -1
X FA        
XI F        
XII NCh 13.25 17 3.75 2     -1.75
XIII PrN       0.25     ms
XIV NP F 7.75 8 0.25 0.75     0.5
XII–XIV N       4 3     NA
XV S2b 3 2.75 2 ms
XVI S3   1.5 3
VII S1         4 2.75 2 -2
VIII + XV S2         4 2.75 2 -2
XVI S3           1.5 3  
VII+VIII+XV PS         8 5.5 4 -4
VII+VIII+XV+XVI RS         8 5.5 4 -4
IX–XI FS       5 0 2.5 4 -1
  S       5 9.5 9.5 9.5 -4.5
XVIIa ECh1 18.75 21.25 2.5 5 it.    
XVIIb ECh2 5.5     7.5
XVIIc TXT   na     ok
XVIId PRG   na    
XVII ECh       2.5 1.5     -1
XVIIIa EML1 51 6 11.5 2.5 na    
XVIIIb EML2 21.25 21.75 0.5 na    
XIX AL 1.25 2.25 2.75 1.25
XVIII–XIX Out       3 1.25 2.25 2.75 -1.75
XX JR   0.25     ms
XXI PrB       ms
I + XIV SLS       7.25 7.75 6.75 6.25 0.5
I SL 21.75 7 6 5.5
     
WLS in:   out:   in:   out:  
Walks     CleanUps     -1 -4 -1
6.5 9.5
DN
9.5 11.5 13.25 17