D   a   y       L   o   g
D   a   y       L   o   g
Monday 12. februára 2007
\
Act. No. Activity nb Began Ended Length prescribed Bonus / Deficit
ideal less least
I SL F 3.75 7 3.25 7 6 5.5 3.75
II EX   0.75     ms
IIIa MCh 51 7 9.25 1.25 1.25     ok
IIIb MCh PF       4 it. Wght  
II–III M       1.25 2     NA
IV FL   0.25     ms
V PrM       0.25     ms
VI QU 17.75 18.25 0.5 0.5     ok
IV–VI US       0.5 1     NA
VII S1 4 2.75 2 ms
VIII S2a 1    
IXa FD       0 2.5 4  
IXb FP   9.25 13.75 4.5 -0.5
X FA        
XI F        
XII NCh 51 13.75 17.75 3.25 2     -1.25
XIII PrN       0.25     ms
XIV NP 52 8 15.75 1.25 0.75     -0.5
XII–XIV N       4.5 3     NA
XV S2b 3 2.75 2 ms
XVI S3 53 8.5 20.25 2.5   1.5 3 0.5
VII S1         4 2.75 2 -2
VIII + XV S2         4 2.75 2 -2
XVI S3       2.5   1.5 3 0.5
VII+VIII+XV PS         8 5.5 4 -4
VII+VIII+XV+XVI RS       2.5 8 5.5 4 -1.5
IX–XI FS       4.5 0 2.5 4 -0.5
  S       7.5 9.5 9.5 9.5 -2
XVIIa ECh1 20.25 20.5 0.25 5 it.    
XVIIb ECh2 5.5     4.75
XVIIc TXT   na     ok
XVIId PRG   na    
XVII ECh       0.25 1.5     1.25
XVIIIa EML1   na    
XVIIIb EML2 na    
XIX AL 1.25 2.25 2.75 1.25
XVIII–XIX Out         1.25 2.25 2.75 1.25
XX JR   0.25     ms
XXI PrB       ms
I + XIV SLS       4.5 7.75 6.75 6.25 3.25
I SL 20.5 7 6 5.5
     
WLS in:   out:   in:   out:  
Walks     CleanUps     -5 -1 -1
8 9 15 15.75
8.5 15 2nd = F
9 18.25