D   a   y       L   o   g
D   a   y       L   o   g
Monday 19. februára 2007
\
Act. No. Activity nb Began Ended Length prescribed Bonus / Deficit
ideal less least
I SL -2 3.5 5.5 7 6 5.5 1.5
II EX   0.75     ms
IIIa MCh 51 3.5 13.25 4 1.25     -2.75
IIIb MCh PF       4 it. Wght  
II–III M       4 2     NA
IV FL   0.25     ms
V PrM       0.25     ms
VI QU   0.5     ms
IV–VI US         1     ms
VII S1 4 2.75 2 ms
VIII S2a 1    
IXa FD       0 2.5 4  
IXb FP 53 6 20 5.5 -1.5
X FA        
XI F        
XII NCh 13.5 15.25 1.75 2     0.25
XIII PrN       0.25     ms
XIV NP 52 9.25 16.75 3.5 0.75     -2.75
XII–XIV N       5.25 3     NA
XV S2b 21.75 22.75 1 3 2.75 2 -1
XVI S3   1.5 3
VII S1         4 2.75 2 -2
VIII + XV S2       1 4 2.75 2 -1
XVI S3           1.5 3  
VII+VIII+XV PS       1 8 5.5 4 -3
VII+VIII+XV+XVI RS       1 8 5.5 4 -3
IX–XI FS       5.5 0 2.5 4 -1.5
  S       6.5 9.5 9.5 9.5 -3
XVIIa ECh1 24.75 26.25 1.5 5 it.    
XVIIb ECh2 5.5     7.25
XVIIc TXT   na     ok
XVIId PRG   na    
XVII ECh       1.5 1.5      
XVIIIa EML1 52 5.25 17.75 1.75 na    
XVIIIb EML2 52 20 24.75 3.75 na    
XIX AL 1.25 2.25 2.75 1.25
XVIII–XIX Out       5.5 1.25 2.25 2.75 -4.25
XX JR   0.25     ok
XXI PrB       ms
I + XIV SLS       9 7.75 6.75 6.25 -1.25
I SL 26.25 7 6 5.5
     
WLS in:   out:   in:   out:  
Walks     CleanUps     -10 -1 -1
5.25 8.25 9.25 11.25 11.5 12.25
6 16.75 21.75 22.75 11.25 15.25
8.25 11.5 12.25 13.25 13.5 17.75