D   a   y       L   o   g
D   a   y       L   o   g
Tuesday 20. februára 2007
\
Act. No. Activity nb Began Ended Length prescribed Bonus / Deficit
ideal less least
I SL F 2.25 8.75 6.5 7 6 5.5 0.5
II EX   0.75     ms
IIIa MCh 8.75 9.75 1 1.25     0.25
IIIb MCh PF       4 it. Wght  
II–III M       1 2     NA
IV FL   0.25     ms
V PrM       0.25     ms
VI QU   0.5     ms
IV–VI US         1     ms
VII S1 4 2.75 2 ms
VIII S2a 1    
IXa FD       0 2.5 4  
IXb FP   11.75 12 0.25  
X FA        
XI F        
XII NCh 13 15.25 2.25 2     -0.25
XIII PrN       0.25     ms
XIV NP   0.75     ms
XII–XIV N       2.25 3     NA
XV S2b 3 2.75 2 ms
XVI S3 51 12 19.5 5.25   1.5 3 -2.25
VII S1         4 2.75 2 -2
VIII + XV S2         4 2.75 2 -2
XVI S3       5.25   1.5 3 -2.25
VII+VIII+XV PS         8 5.5 4 -4
VII+VIII+XV+XVI RS       5.25 8 5.5 4 -2.75
IX–XI FS       0.25 0 2.5 4  
  S       5.5 9.5 9.5 9.5 -4
XVIIa ECh1 52 22.5 26 3.5 5 it.    
XVIIb ECh2 5.5     6.75
XVIIc TXT   na     ok
XVIId PRG   na    
XVII ECh       3.5 1.5     -2
XVIIIa EML1 9.75 11.75 2 na    
XVIIIb EML2 19.5 22.5 3 na    
XIX AL 1.25 2.25 2.75 1.25
XVIII–XIX Out       5 1.25 2.25 2.75 -3.75
XX JR   0.25     ms
XXI PrB       ms
I + XIV SLS       6.5 7.75 6.75 6.25 1.25
I SL 26 7 6 5.5
     
WLS in:   out:   in:   out:  
Walks     CleanUps     -11 -2 -1
13 15.25
last 2 Hours = LT