D   a   y       L   o   g
D   a   y       L   o   g
Saturday 24. februára 2007
\
Act. No. Activity nb Began Ended Length prescribed Bonus / Deficit
ideal less least
I SL -2 10 12 7 6 5.5 -5
II EX   0.75     ms
IIIa MCh 10 10.75 0.75 1.25     0.5
IIIb MCh PF       4 it. Wght  
II–III M       0.75 2     NA
IV FL   0.25     ms
V PrM       0.25     ms
VI QU   0.5     ms
IV–VI US         1     ms
VII S1 4 2.75 2 ms
VIII S2a 18.5 19.75 1.25 1     0.25
IXa FD       0 2.5 4  
IXb FP        
X FA        
XI F        
XII NCh 13.75 16.25 2.5 2     -0.5
XIII PrN       0.25     ms
XIV NP 19.75 22 2.25 0.75     -1.5
XII–XIV N       4.75 3     NA
XV S2b 22.25 25.25 3 3 2.75 2
XVI S3 51 10.75 17.75 4.5   1.5 3 -1.5
VII S1         4 2.75 2 -2
VIII + XV S2       4.25 4 2.75 2 2.25
XVI S3       4.5   1.5 3 -1.5
VII+VIII+XV PS       4.25 8 5.5 4 0.25
VII+VIII+XV+XVI RS       8.75 8 5.5 4 0.75
IX–XI FS         0 2.5 4  
  S       8.75 9.5 9.5 9.5 -0.75
XVIIa ECh1 17.75 18.5 0.75 5 it.    
XVIIb ECh2 22 22.25 0.25 5.5     4.25
XVIIc TXT   na     ok
XVIId PRG   na    
XVII ECh       1 1.5     0.5
XVIIIa EML1   na    
XVIIIb EML2 na    
XIX AL 1.25 2.25 2.75 1.25
XVIII–XIX Out         1.25 2.25 2.75 1.25
XX JR   0.25     ms
XXI PrB       ms
I + XIV SLS       14.25 7.75 6.75 6.25 -6.5
I SL 25.25 7 6 5.5
     
WLS in:   out:   in:   out:  
Walks     CleanUps     -15 -6 -1
13.75 16.25