D   a   y       L   o   g
D   a   y       L   o   g
Wednesday 28. februára 2007
\
Act. No. Activity nb Began Ended Length prescribed Bonus / Deficit
ideal less least
I SL F -1.75 5 6.75 7 6 5.5 0.25
II EX   0.75     ms
IIIa MCh 51 5 10.75 1.75 1.25     -0.5
IIIb MCh PF       4 it. Wght  
II–III M       1.75 2     NA
IV FL   0.25     ms
V PrM       0.25     ms
VI QU   0.5     ms
IV–VI US         1     ms
VII S1 4 2.75 2 ms
VIII S2a 1    
IXa FD       0 2.5 4  
IXb FP 53 6.25 12 4.5 -4.5
X FA   18.5 21.5 3 -3
XI F 52 10.75 18.5 5.5 -1.5
XII NCh 12.75 14.75 2 2     ok
XIII PrN       0.25     ms
XIV NP   0.75     ms
XII–XIV N       2 3     NA
XV S2b 3 2.75 2 ms
XVI S3   1.5 3
VII S1         4 2.75 2 -2
VIII + XV S2         4 2.75 2 -2
XVI S3           1.5 3  
VII+VIII+XV PS         8 5.5 4 -4
VII+VIII+XV+XVI RS         8 5.5 4 -4
IX–XI FS       13 0 2.5 4 -9
  S       4.5 9.5 9.5 9.5 -5
XVIIa ECh1 21.5 23.5 2 5 it.    
XVIIb ECh2 5.5     5.75
XVIIc TXT   na     ok
XVIId PRG   na    
XVII ECh       2 1.5     -0.5
XVIIIa EML1 23.5 25.5 2 na    
XVIIIb EML2 na    
XIX AL 1.25 2.25 2.75 1.25
XVIII–XIX Out       2 1.25 2.25 2.75 -0.75
XX JR   0.25     ms
XXI PrB       ms
I + XIV SLS       6.75 7.75 6.75 6.25 1
I SL 25.5 7 6 5.5
     
WLS in:   out:   in:   out:  
Walks     CleanUps     -19 -3 -1
6.25 10.25
11.75 12 12.75 14.75
10.25 11.5