D   a   y       L   o   g
D   a   y       L   o   g
Friday 2. marca 2007
\
Act. No. Activity nb Began Ended Length prescribed Bonus / Deficit
ideal less least
I SL -0.5 10.75 11.25 7 6 5.5 -4.25
II EX   0.75     ms
IIIa MCh 51 11 13.5 1.75 1.25     -0.5
IIIb MCh PF       4 it. Wght  
II–III M       1.75 2     NA
IV FL   0.25     ms
V PrM       0.25     ms
VI QU   0.5     ms
IV–VI US         1     ms
VII S1 4 2.75 2 ms
VIII S2a 1    
IXa FD       0 2.5 4  
IXb FP 52 11.25 16 3  
X FA        
XI F        
XII NCh 53 14 14.25 0.25 2     1.75
XIII PrN       0.25     ms
XIV NP   0.75     ms
XII–XIV N       0.25 3     NA
XV S2b 3 2.75 2 ms
XVI S3   1.5 3
VII S1         4 2.75 2 -2
VIII + XV S2         4 2.75 2 -2
XVI S3           1.5 3  
VII+VIII+XV PS         8 5.5 4 -4
VII+VIII+XV+XVI RS         8 5.5 4 -4
IX–XI FS       3 0 2.5 4  
  S       3 9.5 9.5 9.5 -6.5
XVIIa ECh1 53 16 22.25 6.25 5 it.    
XVIIb ECh2 5.5     8.25
XVIIc TXT   na     ok
XVIId PRG   na    
XVII ECh       6.25 1.5     -4.75
XVIIIa EML1 10.75 11 0.25 na    
XVIIIb EML2 na    
XIX AL 1.25 2.25 2.75 1.25
XVIII–XIX Out       0.25 1.25 2.25 2.75 1
XX JR   0.25     ms
XXI PrB       ms
I + XIV SLS       11.25 7.75 6.75 6.25 -3.5
I SL 22.25 7 6 5.5
     
WLS in:   out:   in:   out:  
Walks     CleanUps     -2 -5 -1
11.25 12 2nd Part = DN
12 13.5 14 14.25
DN DN, LT