D   a   y       L   o   g
D   a   y       L   o   g
Saturday 3. marca 2007
\
Act. No. Activity nb Began Ended Length prescribed Bonus / Deficit
ideal less least
I SL -1.75 6.5 8.25 7 6 5.5 -1.25
II EX   0.75     ms
IIIa MCh 51 6.5 9.75 3.25 1.25     -2
IIIb MCh PF       4 it. Wght  
II–III M       3.25 2     NA
IV FL   0.25     ms
V PrM       0.25     ms
VI QU   0.5     ms
IV–VI US         1     ms
VII S1 4 2.75 2 ms
VIII S2a 1    
IXa FD       0 2.5 4  
IXb FP        
X FA        
XI F        
XII NCh 2     ms
XIII PrN       0.25     ms
XIV NP 9.75 13.25 3.5 0.75     -2.75
XII–XIV N       3.5 3     NA
XV S2b 3 2.75 2
XVI S3 52 13.25 22.5 4.75   1.5 3 -1.75
VII S1         4 2.75 2 -2
VIII + XV S2         4 2.75 2 -2
XVI S3       4.75   1.5 3 -1.75
VII+VIII+XV PS         8 5.5 4 -4
VII+VIII+XV+XVI RS       4.75 8 5.5 4 -3.25
IX–XI FS         0 2.5 4  
  S       4.75 9.5 9.5 9.5 -4.75
XVIIa ECh1 17 21.5 4.5 5 it.    
XVIIb ECh2 22.5 23.25 0.75 5.5     8.5
XVIIc TXT   na     ok
XVIId PRG   na    
XVII ECh       5.25 1.5     -3.75
XVIIIa EML1   na    
XVIIIb EML2 na    
XIX AL 1.25 2.25 2.75 1.25
XVIII–XIX Out         1.25 2.25 2.75 1.25
XX JR   0.25     ms
XXI PrB       ms
I + XIV SLS       11.75 7.75 6.75 6.25 -4
I SL 23.25 7 6 5.5
     
WLS in:   out:   in:   out:  
Walks     CleanUps     -3 -6 -1
incl. LT, DN  
17 21.5