D   a   y       L   o   g
D   a   y       L   o   g
Friday 9. marca 2007
\
Act. No. Activity nb Began Ended Length prescribed Bonus / Deficit
ideal less least
I SL F -2 6.5 8.5 7 6 5.5 -1.5
II EX   0.75     ms
IIIa MCh 6.5 7.25 0.75 1.25     0.5
IIIb MCh PF       4 it. Wght  
II–III M       0.75 2     NA
IV FL   0.25     ms
V PrM       0.25     ms
VI QU   0.5     ms
IV–VI US         1     ms
VII S1 4 2.75 2 ms
VIII S2a 1    
IXa FD       0 2.5 4  
IXb FP 52 7.75 15.5 3.5  
X FA        
XI F        
XII NCh 2     ms
XIII PrN       0.25     ms
XIV NP 53 8 19.5 3 0.75     -2.25
XII–XIV N       3 3     NA
XV S2b 22 22.25 0.25 3 2.75 2 -1.75
XVI S3   1.5 3
VII S1         4 2.75 2 -2
VIII + XV S2       0.25 4 2.75 2 -1.75
XVI S3           1.5 3  
VII+VIII+XV PS       0.25 8 5.5 4 -3.75
VII+VIII+XV+XVI RS       0.25 8 5.5 4 -3.75
IX–XI FS       3.5 0 2.5 4  
  S       3.75 9.5 9.5 9.5 -5.75
XVIIa ECh1 19.5 22 2.5 5 it.    
XVIIb ECh2 5.5     3.25
XVIIc TXT   na     ok
XVIId PRG   na    
XVII ECh       2.5 1.5     -1
XVIIIa EML1 51 7.25 14.5 3.25 na    
XVIIIb EML2 15.5 18 2.5 na    
XIX AL 1.25 2.25 2.75 1.25
XVIII–XIX Out       5.75 1.25 2.25 2.75 -4.5
XX JR   0.25     ms
XXI PrB       ms
I + XIV SLS       11.5 7.75 6.75 6.25 -3.75
I SL 22.25 7 6 5.5
     
WLS in:   out:   in:   out:  
Walks     CleanUps     -5 -3 -1
7.75 9.25 9.5 11.75 13.25 13.5
8 9.5 11.75 14.5
9.25 13.25 13.5 18