D   a   y       L   o   g
D   a   y       L   o   g
Saturday 10. marca 2007
\
Act. No. Activity nb Began Ended Length prescribed Bonus / Deficit
ideal less least
I SL -1.75 9.75 11.5 7 6 5.5 -4.5
II EX inc   0.75     ms
IIIa MCh 9.75 10 0.25 1.25     1
IIIb MCh PF       4 it. Wght  
II–III M       0.25 2     NA
IV FL   0.25     ms
V PrM       0.25     ms
VI QU   0.5     ms
IV–VI US         1     ms
VII S1 4 2.75 2 ms
VIII S2a 1    
IXa FD       0 2.5 4  
IXb FP        
X FA        
XI F        
XII NCh 14.5 23 8.5 2     -6.5
XIII PrN       0.25     ms
XIV NP   0.75     ms
XII–XIV N       8.5 3     NA
XV S2b 12 14.5 2.5 3 2.75 2 -0.5
XVI S3   1.5 3
VII S1         4 2.75 2 -4
VIII + XV S2       2.5 4 2.75 2 -1.5
XVI S3           1.5 3  
VII+VIII+XV PS       2.5 8 5.5 4 -5.5
VII+VIII+XV+XVI RS       2.5 8 5.5 4 -5.5
IX–XI FS         0 2.5 4  
  S       2.5 9.5 9.5 9.5 -7
XVIIa ECh1 5 it.    
XVIIb ECh2 5.5     8.75
XVIIc TXT   na     ok
XVIId PRG   na    
XVII ECh         1.5     1.5
XVIIIa EML1 10 12 2 na    
XVIIIb EML2 na    
XIX AL 1.25 2.25 2.75 1.25
XVIII–XIX Out       2 1.25 2.25 2.75 -0.75
XX JR   0.25     ms
XXI PrB       ms
I + XIV SLS       11.5 7.75 6.75 6.25 -3.75
I SL 23 7 6 5.5
     
WLS in:   out:   in:   out:  
Walks     CleanUps     -6 -4 -1