D   a   y       L   o   g
D   a   y       L   o   g
Sunday 11. marca 2007
\
Act. No. Activity nb Began Ended Length prescribed Bonus / Deficit
ideal less least
I SL -1 2 3 7 6 5.5 4
II EX   0.75     ms
IIIa MCh 2 6 4 1.25     -2.75
IIIb MCh PF       4 it. Wght  
II–III M       4 2     NA
IV FL   0.25     ms
V PrM       0.25     ms
VI QU   0.5     ms
IV–VI US         1     ms
VII S1 4 2.75 2 ms
VIII S2a 1    
IXa FD       0 2.5 4  
IXb FP        
X FA        
XI F        
XII NCh 51 13 20 7 2     -5
XIII PrN       0.25     ms
XIV NP 6 13 7 0.75     -6.25
XII–XIV N       14 3     NA
XV S2b 20 21 1 3 2.75 2 -2
XVI S3   1.5 3
VII S1         4 2.75 2 -4
VIII + XV S2       1 4 2.75 2 -3
XVI S3           1.5 3  
VII+VIII+XV PS       1 8 5.5 4 -7
VII+VIII+XV+XVI RS       1 8 5.5 4 -7
IX–XI FS         0 2.5 4  
  S       1 9.5 9.5 9.5 -8.5
XVIIa ECh1 5 it.    
XVIIb ECh2 5.5     11
XVIIc TXT   na     ok
XVIId PRG   na    
XVII ECh         1.5     1.5
XVIIIa EML1   na    
XVIIIb EML2 na    
XIX AL 1.25 2.25 2.75 1.25
XVIII–XIX Out         1.25 2.25 2.75 1.25
XX JR   0.25     ms
XXI PrB       ms
I + XIV SLS       10 7.75 6.75 6.25 -2.25
I SL 21 7 6 5.5
     
WLS in:   out:   in:   out:  
Walks     CleanUps     -7 -5 -1
incl. DN, LT