D   a   y       L   o   g
Tuesday 13. marca 2007
\
Act. No. Activity nb Began Ended Length prescribed Bonus / Deficit
ideal less least
I SL -1.5 9.25 10.75 7 6 5.5 -3.75
II EX   0.75     ms
IIIa MCh 9.25 12.25 3 1.25     -1.75
IIIb MCh PF       4 it. Wght  
II–III M       3 2     NA
IV FL   0.25     ms
V PrM       0.25     ms
VI QU   0.5     ms
IV–VI US         1     ms
VII S1 4 2.75 2 ms
VIII S2a 12.25 13.25 1 1    
IXa FD       0 2.5 4  
IXb FP 51 13.25 16.25 2  
X FA        
XI F        
XII NCh 14.75 15 0.25 2     1.75
XIII PrN       0.25     ms
XIV NP 52 15 16.75 1.25 0.75     -0.5
XII–XIV N       1.5 3     NA
XV S2b 18.75 21.75 3 3 2.75 2
XVI S3   1.5 3
VII S1         4 2.75 2 -2.75
VIII + XV S2       4 4 2.75 2 1.25
XVI S3           1.5 3  
VII+VIII+XV PS       4 8 5.5 4 -1.5
VII+VIII+XV+XVI RS       4 8 5.5 4 -1.5
IX–XI FS       2 0 2.5 4  
  S       6 9.5 9.5 9.5 -3.5
XVIIa ECh1 16.75 18.75 2 5 it.    
XVIIb ECh2 5.5     5.25
XVIIc TXT   na     ok
XVIId PRG   na    
XVII ECh       2 1.5     -0.5
XVIIIa EML1   na    
XVIIIb EML2 na    
XIX AL 1.25 2.25 2.75 1.25
XVIII–XIX Out         1.25 2.25 2.75 1.25
XX JR   0.25     ms
XXI PrB       ms
I + XIV SLS       12 7.75 6.75 6.25 -4.25
I SL 21.75 7 6 5.5
     
WLS in:   out:   in:   out:  
Walks     CleanUps     -9 -2 -1
14.75 15.75
15.75 16.25 1st Part = F