D   a   y       L   o   g
D   a   y       L   o   g
Thursday 29. marca 2007
\
Act. No. Activity nb Began Ended Length prescribed Bonus / Deficit
ideal less least
I SL F 2 6 4 7 6 5.5 3
II EX   0.75     ms
IIIa MCh 6 7 1 1.25     0.25
IIIb MCh PF       4 it. Wght  
II–III M       1 2     NA
IV FL   0.25     ms
V PrM       0.25     ms
VI QU   0.5     ms
IV–VI US         1     ms
VII S1 4 2.75 2 ms
VIII S2a 1    
IXa FD       0 2.5 4  
IXb FP 52 7.5 17.75 6.75 -2.75
X FA        
XI F        
XII NCh 12.5 13.75 1.25 2     0.75
XIII PrN       0.25     ms
XIV NP 51 7 14.5 1.25 0.75     -0.5
XII–XIV N       2.5 3     NA
XV S2b 3 2.75 2 ms
XVI S3   1.5 3
VII S1         4 2.75 2 -2
VIII + XV S2         4 2.75 2 -2
XVI S3           1.5 3  
VII+VIII+XV PS         8 5.5 4 -4
VII+VIII+XV+XVI RS         8 5.5 4 -4
IX–XI FS       6.75 0 2.5 4 -2.75
  S       6.75 9.5 9.5 9.5 -2.75
XVIIa ECh1 17.75 20 2.25 5 it.    
XVIIb ECh2 5.5     4.5
XVIIc TXT   na     ok
XVIId PRG   na    
XVII ECh       2.25 1.5     -0.75
XVIIIa EML1 11 12.5 1.5 na    
XVIIIb EML2 na    
XIX AL 1.25 2.25 2.75 1.25
XVIII–XIX Out       1.5 1.25 2.25 2.75 -0.25
XX JR   0.25     ms
XXI PrB       ms
I + XIV SLS       5.25 7.75 6.75 6.25 2.5
I SL 20 7 6 5.5
     
WLS in:   out:   in:   out:  
Walks     CleanUps     -23 -4 -1
7.5 13.75 2nd Part = F
11 14.5