D   a   y       L   o   g
D   a   y       L   o   g
Monday 2. apríla 2007
\
Act. No. Activity nb Began Ended Length prescribed Bonus / Deficit
ideal less least
I SL F 2.75 7 4.25 7 6 5.5 2.75
II EX   0.75     ms
IIIa MCh 7 8 1 1.25     0.25
IIIb MCh PF       4 it. Wght  
II–III M       1 2     NA
IV FL   0.25     ms
V PrM       0.25     ms
VI QU   0.5     ms
IV–VI US         1     ms
VII S1 4 2.75 2 ms
VIII S2a 1    
IXa FD       0 2.5 4  
IXb FP 51 8 14.5 6 -2
X FA        
XI F        
XII NCh 14.5 22.5 8 2     -6
XIII PrN       0.25     ms
XIV NP F 11.25 11.75 0.5 0.75     0.25
XII–XIV N       8.5 3     NA
XV S2b 3 2.75 2 ms
XVI S3   1.5 3
VII S1         4 2.75 2 -2
VIII + XV S2         4 2.75 2 -2
XVI S3           1.5 3  
VII+VIII+XV PS         8 5.5 4 -4
VII+VIII+XV+XVI RS         8 5.5 4 -4
IX–XI FS       6 0 2.5 4 -2
  S       6 9.5 9.5 9.5 -3.5
XVIIa ECh1 5 it.    
XVIIb ECh2 5.5     9
XVIIc TXT   na    
XVIId PRG   na    
XVII ECh         1.5     1.5
XVIIIa EML1   na    
XVIIIb EML2 na    
XIX AL 1.25 2.25 2.75 1.25
XVIII–XIX Out         1.25 2.25 2.75 1.25
XX JR   0.25     ms
XXI PrB       ms
I + XIV SLS       4.75 7.75 6.75 6.25 3
I SL 22.5 7 6 5.5
     
WLS in:   out:   in:   out:  
Walks     CleanUps     -1
11.25 11.75