D   a   y       L   o   g
Friday 13. apríla 2007
\
Act. No. Activity nb Began Ended Length prescribed Bonus / Deficit
ideal less least
I SL 1.5 6.75 5.25 7 6 5.5 1.75
II EX   0.75     ms
IIIa MCh 6.75 9.25 2.5 1.25     -1.25
IIIb MCh PF       4 it. Wght  
II–III M       2.5 2     NA
IV FL   0.25     ms
V PrM       0.25     ms
VI QU   0.5     ms
IV–VI US         1     ms
VII S1 4 2.75 2 ms
VIII S2a 1    
IXa FD       0 2.5 4  
IXb FP   15.5 17 1.5  
X FA        
XI F        
XII NCh 13.5 15.5 2 2     ok
XIII PrN       0.25     ms
XIV NP 51 10.25 25.75 10.5 0.75     -9.75
XII–XIV N       12.5 3     NA
XV S2b 3 2.75 2 ms
XVI S3   1.5 3
VII S1         4 2.75 2 -2.75
VIII + XV S2         4 2.75 2 -2.75
XVI S3           1.5 3  
VII+VIII+XV PS         8 5.5 4 -5.5
VII+VIII+XV+XVI RS         8 5.5 4 -5.5
IX–XI FS       1.5 0 2.5 4  
  S       1.5 9.5 9.5 9.5 -8
XVIIa ECh1 25.75 27.25 1.5 5 it.    
XVIIb ECh2 5.5     6
XVIIc TXT   na    
XVIId PRG   na    
XVII ECh       1.5 1.5      
XVIIIa EML1 9.25 10.25 1 na    
XVIIIb EML2 17 18.5 1.5 na    
XIX AL 1.25 2.25 2.75 1.25
XVIII–XIX Out       2.5 1.25 2.25 2.75 -1.25
XX JR   0.25     ms
XXI PrB       ms
I + XIV SLS       15.75 7.75 6.75 6.25 -8
I SL 27.25 7 6 5.5
     
WLS in:   out:   in:   out:  
Walks     CleanUps     -1
13.5 18.5