D   a   y       L   o   g
D   a   y       L   o   g
Wednesday 2. mája 2007
\
Act. No. Activity nb Began Ended Length prescribed Bonus / Deficit
ideal less least
I SL F 0.75 5 4.25 7 6 5.5 2.75
II EX   0.75     ms
IIIa MCh 51 5 10 1 1.25     0.25
IIIb MCh PF       4 it. Wght  
II–III M       1 2     NA
IV FL   0.25     ms
V PrM       0.25     ms
VI QU   0.5     ms
IV–VI US         1     ms
VII S1 4 2.75 2 ms
VIII S2a 1    
IXa FD       0 2.5 4  
IXb FP 51 5.5 16.5 4.25 -0.25
X FA        
XI F   16.5 17.75 1.25 -1.25
XII NCh 13.25 15.25 2 2     ok
XIII PrN       0.25     ms
XIV NP F 11 12.5 1.5 0.75     -0.75
XII–XIV N       3.5 3     NA
XV S2b 19.75 20.75 1 3 2.75 2 -1
XVI S3   1.5 3
VII S1         4 2.75 2 -2
VIII + XV S2       1 4 2.75 2 -1
XVI S3           1.5 3  
VII+VIII+XV PS       1 8 5.5 4 -3
VII+VIII+XV+XVI RS       1 8 5.5 4 -3
IX–XI FS       5.5 0 2.5 4 -1.5
  S       5.25 9.5 9.5 9.5 -4.25
XVIIa ECh1 17.75 19.75 2 5 it.    
XVIIb ECh2 21.5 22.25 0.75 5.5     5.75
XVIIc TXT   na    
XVIId PRG   na    
XVII ECh       2.75 1.5     -1.25
XVIIIa EML1 52 7.5 13.25 2.75 na    
XVIIIb EML2 20.75 21.5 0.75 na    
XIX AL 1.25 2.25 2.75 1.25
XVIII–XIX Out       3.5 1.25 2.25 2.75 -2.25
XX JR   0.25     ms
XXI PrB       ms
I + XIV SLS       5.75 7.75 6.75 6.25 2
I SL 22.25 7 6 5.5
     
WLS in:   out:   in:   out:  
Walks     CleanUps     -1
5.5 9.5 7.5 10 11 15.25
9.5 12.5