D   a   y       L   o   g
D   a   y       L   o   g
Friday 4. mája 2007
\
Act. No. Activity nb Began Ended Length prescribed Bonus / Deficit
ideal less least
I SL F -1 5.25 6.25 7 6 5.5 0.75
II EX   0.75     ms
IIIa MCh 5.25 6 0.75 1.25     0.5
IIIb MCh PF       4 it. Wght  
II–III M       0.75 2     NA
IV FL   0.25     ms
V PrM       0.25     ms
VI QU   0.5     ms
IV–VI US         1     ms
VII S1 4 2.75 2 ms
VIII S2a 1    
IXa FD       0 2.5 4  
IXb FP 51 6 20 5.5 -1.5
X FA        
XI F        
XII NCh 12.5 15.75 3.25 2     -1.25
XIII PrN       0.25     ms
XIV NP   0.75     ms
XII–XIV N       3.25 3     NA
XV S2b 3 2.75 2 ms
XVI S3 11.5 12.5 1   1.5 3
VII S1         4 2.75 2 -2
VIII + XV S2         4 2.75 2 -2
XVI S3       1   1.5 3  
VII+VIII+XV PS         8 5.5 4 -4
VII+VIII+XV+XVI RS       1 8 5.5 4 -3
IX–XI FS       5.5 0 2.5 4 -1.5
  S       6.5 9.5 9.5 9.5 -3
XVIIa ECh1 20 22.75 2.75 5 it.    
XVIIb ECh2 5.5     6.75
XVIIc TXT   na    
XVIId PRG   na    
XVII ECh       2.75 1.5     -1.25
XVIIIa EML1 10.5 11.5 1 na    
XVIIIb EML2 15.75 19 3.25 na    
XIX AL 1.25 2.25 2.75 1.25
XVIII–XIX Out       4.25 1.25 2.25 2.75 -3
XX JR   0.25     ms
XXI PrB       ms
I + XIV SLS       6.25 7.75 6.75 6.25 1.5
I SL 22.75 7 6 5.5
     
WLS in:   out:   in:   out:  
Walks     CleanUps     -1
10.5 19