D   a   y       L   o   g
D   a   y       L   o   g
Sunday 6. mája 2007
\
Act. No. Activity nb Began Ended Length prescribed Bonus / Deficit
ideal less least
I SL 1.25 11.25 10 7 6 5.5 -3
II EX   0.75     ms
IIIa MCh 11.25 12.5 1.25 1.25     ok
IIIb MCh PF       4 it. Wght  
II–III M       1.25 2     NA
IV FL   0.25     ms
V PrM       0.25     ms
VI QU   0.5     ms
IV–VI US         1     ms
VII S1 4 2.75 2 ms
VIII S2a 14 16 2 1     1
IXa FD       0 2.5 4  
IXb FP        
X FA        
XI F        
XII NCh 2     ms
XIII PrN       0.25     ms
XIV NP   0.75     ms
XII–XIV N         3     ms
XV S2b 18 19 1 3 2.75 2 -2
XVI S3   1.5 3
VII S1         4 2.75 2 -4
VIII + XV S2       3 4 2.75 2 -1
XVI S3           1.5 3  
VII+VIII+XV PS       3 8 5.5 4 -5
VII+VIII+XV+XVI RS       3 8 5.5 4 -5
IX–XI FS         0 2.5 4  
  S       3 9.5 9.5 9.5 -6.5
XVIIa ECh1 19 23.25 4.25 5 it.    
XVIIb ECh2 5.5     5.5
XVIIc TXT   na    
XVIId PRG   na    
XVII ECh       4.25 1.5     -2.75
XVIIIa EML1 12.5 14 1.5 na    
XVIIIb EML2 16 18 2 na    
XIX AL 1.25 2.25 2.75 1.25
XVIII–XIX Out       3.5 1.25 2.25 2.75 -2.25
XX JR   0.25     ms
XXI PrB       ms
I + XIV SLS       10 7.75 6.75 6.25 -2.25
I SL 23.25 7 6 5.5
     
WLS in:   out:   in:   out:  
Walks     CleanUps     -1