D   a   y       L   o   g
D   a   y       L   o   g
Monday 7. mája 2007
\
Act. No. Activity nb Began Ended Length prescribed Bonus / Deficit
ideal less least
I SL F -0.75 4.5 5.25 7 6 5.5 1.75
II EX   0.75     ms
IIIa MCh 4.5 4.75 0.25 1.25     1
IIIb MCh PF       4 it. Wght  
II–III M       0.25 2     NA
IV FL   0.25     ms
V PrM       0.25     ms
VI QU   0.5     ms
IV–VI US         1     ms
VII S1 4 2.75 2 ms
VIII S2a 1    
IXa FD       0 2.5 4  
IXb FP 51 4.75 18 11 -7
X FA        
XI F        
XII NCh 2     ms
XIII PrN       0.25     ms
XIV NP 52 6.25 19.75 2.25 0.75     -1.5
XII–XIV N       2.25 3     NA
XV S2b 3 2.75 2 ms
XVI S3   1.5 3
VII S1         4 2.75 2 -2
VIII + XV S2         4 2.75 2 -2
XVI S3           1.5 3  
VII+VIII+XV PS         8 5.5 4 -4
VII+VIII+XV+XVI RS         8 5.5 4 -4
IX–XI FS       11 0 2.5 4 -7
  S       11 9.5 9.5 9.5 1.5
XVIIa ECh1 18 19 1 5 it.    
XVIIb ECh2 53 19.75 23.5 3.75 5.5     5
XVIIc TXT   na    
XVIId PRG   na    
XVII ECh       4.75 1.5     -3.25
XVIIIa EML1 12.25 13 0.75 na    
XVIIIb EML2 na    
XIX AL 1.25 2.25 2.75 1.25
XVIII–XIX Out       0.75 1.25 2.25 2.75 0.5
XX JR   0.25     ms
XXI PrB       ms
I + XIV SLS       7.5 7.75 6.75 6.25 0.25
I SL 23.5 7 6 5.5
     
WLS in:   out:   in:   out:  
Walks     CleanUps     -1
6.25 6.75 11.25 13
6.75 11.25 12.25 19 first 2 = F
incl. LT