D   a   y       L   o   g
D   a   y       L   o   g
Monday 14. mája 2007
\
Act. No. Activity nb Began Ended Length prescribed Bonus / Deficit
ideal less least
I SL F 1.25 6.25 5 7 6 5.5 2
II EX   0.75     ms
IIIa MCh 6.25 6.75 0.5 1.25     0.75
IIIb MCh PF       4 it. Wght  
II–III M       0.5 2     NA
IV FL   0.25     ms
V PrM       0.25     ms
VI QU   0.5     ms
IV–VI US         1     ms
VII S1 4 2.75 2 ms
VIII S2a 14.75 15.5 0.75 1    
IXa FD       0 2.5 4  
IXb FP   7.75 12 4.25 -4.25
X FA        
XI F        
XII NCh 2     ms
XIII PrN       0.25     ms
XIV NP 52 12.75 17 3.5 0.75     -2.75
XII–XIV N       3.5 3     NA
XV S2b 20 23 3 3 2.75 2 1
XVI S3   1.5 3
VII S1         4 2.75 2 -2
VIII + XV S2       3.75 4 2.75 2 1.75
XVI S3           1.5 3  
VII+VIII+XV PS       3.75 8 5.5 4 -0.25
VII+VIII+XV+XVI RS       3.75 8 5.5 4 -0.25
IX–XI FS       4.25 0 2.5 4 -0.25
  S       8 9.5 9.5 9.5 -1.5
XVIIa ECh1 23 24 1 5 it.    
XVIIb ECh2 5.5     1.5
XVIIc TXT   na    
XVIId PRG   na    
XVII ECh       1 1.5     0.5
XVIIIa EML1 51 6.75 12.75 1.75 na    
XVIIIb EML2 17 20 3 na    
XIX AL 1.25 2.25 2.75 1.25
XVIII–XIX Out       4.75 1.25 2.25 2.75 -3.5
XX JR   0.25     ms
XXI PrB       ms
I + XIV SLS       8.5 7.75 6.75 6.25 -0.75
I SL 24 7 6 5.5
     
WLS in:   out:   in:   out:  
Walks     CleanUps     -1
7.75 12
14.75 15.5 2nd Part = F