D   a   y       L   o   g
D   a   y       L   o   g
Thursday 17. mája 2007
\
Act. No. Activity nb Began Ended Length prescribed Bonus / Deficit
ideal less least
I SL -1.5 4.5 6 7 6 5.5 1
II EX sr 10.25 11 0.75 0.75     ok
IIIa MCh 51 4.5 13.5 3.25 1.25     -2
IIIb MCh PF       4 it. Wght  
II–III M       4 2     -2
IV FL   0.25     ms
V PrM       0.25     ms
VI QU 11.5 12 0.5 0.5     ok
IV–VI US       0.5 1     NA
VII S1 4 2.75 2 ms
VIII S2a 1    
IXa FD       0 2.5 4  
IXb FP        
X FA        
XI F        
XII NCh 13.5 18 4.5 2     -2.5
XIII PrN       0.25     ms
XIV NP 51 5.75 18.75 4.25 0.75     -3.5
XII–XIV N       8.75 3     NA
XV S2b 19.5 23 3.5 3 2.75 2 0.5
XVI S3   1.5 3
VII S1         4 2.75 2 -4
VIII + XV S2       3.5 4 2.75 2 -0.5
XVI S3           1.5 3  
VII+VIII+XV PS       3.5 8 5.5 4 -4.5
VII+VIII+XV+XVI RS       3.5 8 5.5 4 -4.5
IX–XI FS         0 2.5 4  
  S       4 9.5 9.5 9.5 -5.5
XVIIa ECh1 18.75 19.5 0.75 5 it.    
XVIIb ECh2 23 25.25 2.25 5.5     11.5
XVIIc TXT   na    
XVIId PRG   na    
XVII ECh       3 1.5     -1.5
XVIIIa EML1 52 8.75 10.25 1 na    
XVIIIb EML2 25.25 26 0.75 na    
XIX AL 1.25 2.25 2.75 1.25
XVIII–XIX Out       1.75 1.25 2.25 2.75 -0.5
XX JR 11.5 11.5   0.25     ok
XXI PrB       ms
I + XIV SLS       10.25 7.75 6.75 6.25 -2.5
I SL 26 7 6 5.5
     
WLS in:   out:   in:   out:  
Walks     CleanUps     1
5.75 11 11.5 12 8.75 9.5 10 18
9.5 10
Network Day, or should I say Evening