D   a   y       L   o   g
D   a   y       L   o   g
Friday 18. mája 2007
\
Act. No. Activity nb Began Ended Length prescribed Bonus / Deficit
ideal less least
I SL 2 9.25 7.25 7 6 5.5 -0.25
II EX   0.75     ms
IIIa MCh 1.25     ms
IIIb MCh PF       4 it. Wght  
II–III M         2     NA
IV FL   0.25     ms
V PrM       0.25     ms
VI QU   0.5     ms
IV–VI US         1     ms
VII S1 4 2.75 2 ms
VIII S2a 1    
IXa FD       0 2.5 4  
IXb FP   12.25 12.75 0.5  
X FA        
XI F        
XII NCh 9.75 11 1.25 2     0.75
XIII PrN       0.25     ms
XIV NP   0.75     ms
XII–XIV N       1.25 3     NA
XV S2b 9.25 9.75 0.5 3 2.75 2 -2.5
XVI S3   1.5 3
VII S1         4 2.75 2 -4
VIII + XV S2       0.5 4 2.75 2 -3.5
XVI S3           1.5 3  
VII+VIII+XV PS       0.5 8 5.5 4 -7.5
VII+VIII+XV+XVI RS       0.5 8 5.5 4 -7.5
IX–XI FS       0.5 0 2.5 4 -0.5
  S       1 9.5 9.5 9.5 -8.5
XVIIa ECh1 13.75 19.75 6 5 it.    
XVIIb ECh2 5.5     7.25
XVIIc TXT   na    
XVIId PRG   na    
XVII ECh       6 1.5     -4.5
XVIIIa EML1 11 12.25 1.25 na    
XVIIIb EML2 12.75 13.75 1 na    
XIX AL 1.25 2.25 2.75 1.25
XVIII–XIX Out       2.25 1.25 2.25 2.75 -1
XX JR 9.75 9.75   0.25     ms
XXI PrB       ms
I + XIV SLS       7.25 7.75 6.75 6.25 0.5
I SL 19.75 7 6 5.5
     
WLS in:   out:   in:   out:  
Walks     CleanUps     -1