D   a   y       L   o   g
D   a   y       L   o   g
Saturday 26. mája 2007
\
Act. No. Activity nb Began Ended Length prescribed Bonus / Deficit
ideal less least
I SL 2.25 10 7.75 7 6 5.5 -0.75
II EX   0.75     ms
IIIa MCh 51 10 15.75 5.75 1.25     -4.5
IIIb MCh PF       4 it. Wght  
II–III M       5.75 2     NA
IV FL   0.25     ms
V PrM       0.25     ms
VI QU   0.5     ms
IV–VI US         1     ms
VII S1 4 2.75 2 ms
VIII S2a 1    
IXa FD       0 2.5 4  
IXb FP        
X FA        
XI F        
XII NCh 2     ms
XIII PrN       0.25     ms
XIV NP 15.75 19.25 3.5 0.75     -2.75
XII–XIV N       3.5 3     NA
XV S2b 3 2.75 2 ms
XVI S3   1.5 3
VII S1         4 2.75 2 -4
VIII + XV S2         4 2.75 2 -4
XVI S3           1.5 3  
VII+VIII+XV PS         8 5.5 4 -8
VII+VIII+XV+XVI RS         8 5.5 4 -8
IX–XI FS         0 2.5 4  
  S         9.5 9.5 9.5 -9.5
XVIIa ECh1 51 19.25 27 7.75 5 it.    
XVIIb ECh2 5.5     13.5
XVIIc TXT   na    
XVIId PRG   na    
XVII ECh       7.75 1.5     -6.25
XVIIIa EML1   na    
XVIIIb EML2 na    
XIX AL 1.25 2.25 2.75 1.25
XVIII–XIX Out         1.25 2.25 2.75 1.25
XX JR   0.25     ms
XXI PrB       ms
I + XIV SLS       11.25 7.75 6.75 6.25 -3.5
I SL 27 7 6 5.5
     
WLS in:   out:   in:   out:  
Walks     CleanUps     -1
DN