D   a   y       L   o   g
D   a   y       L   o   g
Wednesday 30. mája 2007
\
Act. No. Activity nb Began Ended Length prescribed Bonus / Deficit
ideal less least
I SL F -0.5 8.5 7.75 7 6 5.5 -0.75
II EX   0.75     ms
IIIa MCh 8.25 9.25 1 1.25     0.25
IIIb MCh PF       4 it. Wght  
II–III M       1 2     NA
IV FL   0.25     ms
V PrM       0.25     ms
VI QU   0.5     ms
IV–VI US         1     ms
VII S1 4 2.75 2 ms
VIII S2a 1    
IXa FD       0 2.5 4  
IXb FP   9.25 10.75 1.5  
X FA        
XI F        
XII NCh 2     ms
XIII PrN       0.25     ms
XIV NP 19 20 1 0.75     -0.25
XII–XIV N       1 3     NA
XV S2b 3 2.75 2 ms
XVI S3   1.5 3
VII S1         4 2.75 2 -4
VIII + XV S2         4 2.75 2 -4
XVI S3           1.5 3  
VII+VIII+XV PS         8 5.5 4 -8
VII+VIII+XV+XVI RS         8 5.5 4 -8
IX–XI FS       1.5 0 2.5 4  
  S       1.5 9.5 9.5 9.5 -8
XVIIa ECh1 5 it.    
XVIIb ECh2 5.5     1
XVIIc TXT   na    
XVIId PRG   na    
XVII ECh         1.5     1.5
XVIIIa EML1 0.5 1.75 1.25 na    
XVIIIb EML2 51 10.75 24.75 13 na    
XIX AL 1.25 2.25 2.75 1.25
XVIII–XIX Out       14.25 1.25 2.25 2.75 -13
XX JR   0.25     ms
XXI PrB       ms
I + XIV SLS       8.75 7.75 6.75 6.25 -1
I SL 24.75 7 6 5.5
     
WLS in:   out:   in:   out:  
Walks     CleanUps     -1
0.5 1.75 19 20