D   a   y       L   o   g
D   a   y       L   o   g
Saturday 2. júna 2007
\
Act. No. Activity nb Began Ended Length prescribed Bonus / Deficit
ideal less least
I SL -5 5.75 10.75 7 6 5.5 -3.75
II EX   0.75     ms
IIIa MCh 5.75 6.5 0.75 1.25     0.5
IIIb MCh PF       4 it. Wght  
II–III M       0.75 2     NA
IV FL   0.25     ms
V PrM       0.25     ms
VI QU   0.5     ms
IV–VI US         1     ms
VII S1 4 2.75 2 ms
VIII S2a 1    
IXa FD       0 2.5 4  
IXb FP   11.75 12.25 0.5  
X FA        
XI F        
XII NCh 12.25 14.5 2.25 2     -0.25
XIII PrN       0.25     ms
XIV NP 15.25 17.5 2.25 0.75     -1.5
XII–XIV N       4.5 3     NA
XV S2b 14.5 15.25 0.75 3 2.75 2 -2.25
XVI S3   1.5 3
VII S1         4 2.75 2 -4
VIII + XV S2       0.75 4 2.75 2 -3.25
XVI S3           1.5 3  
VII+VIII+XV PS       0.75 8 5.5 4 -7.25
VII+VIII+XV+XVI RS       0.75 8 5.5 4 -7.25
IX–XI FS       0.5 0 2.5 4  
  S       1.25 9.5 9.5 9.5 -8.25
XVIIa ECh1 23 24.75 1.75 5 it.    
XVIIb ECh2 5.5     4.75
XVIIc TXT   na    
XVIId PRG   na    
XVII ECh       1.75 1.5     -0.25
XVIIIa EML1 6.5 11.75 5.25 na    
XVIIIb EML2 17.5 23 5.5 na    
XIX AL 1.25 2.25 2.75 1.25
XVIII–XIX Out       10.75 1.25 2.25 2.75 -9.5
XX JR   0.25     ms
XXI PrB       ms
I + XIV SLS       13 7.75 6.75 6.25 -5.25
I SL 24.75 7 6 5.5
     
WLS in:   out:   in:   out:  
Walks     CleanUps     -1