D   a   y       L   o   g
D   a   y       L   o   g
Sunday 3. júna 2007
\
Act. No. Activity nb Began Ended Length prescribed Bonus / Deficit
ideal less least
I SL 0.75 8 7.25 7 6 5.5 -0.25
II EX   0.75     ms
IIIa MCh 8 8.75 0.75 1.25     0.5
IIIb MCh PF       4 it. Wght  
II–III M       0.75 2     NA
IV FL   0.25     ms
V PrM       0.25     ms
VI QU   0.5     ms
IV–VI US         1     ms
VII S1 4 2.75 2 ms
VIII S2a 1    
IXa FD       0 2.5 4  
IXb FP   13.5 16 2.5  
X FA        
XI F        
XII NCh 16 19.5 3.5 2     -1.5
XIII PrN       0.25     ms
XIV NP   0.75     ms
XII–XIV N       3.5 3     NA
XV S2b 3 2.75 2 ms
XVI S3 11.5 13.5 2   1.5 3 1
VII S1         4 2.75 2 -2
VIII + XV S2         4 2.75 2 -2
XVI S3       2   1.5 3 1
VII+VIII+XV PS         8 5.5 4 -4
VII+VIII+XV+XVI RS       2 8 5.5 4 -3.5
IX–XI FS       2.5 0 2.5 4  
  S       4.5 9.5 9.5 9.5 -5
XVIIa ECh1 5 it.    
XVIIb ECh2 5.5     4.25
XVIIc TXT   na    
XVIId PRG   na    
XVII ECh         1.5     1.5
XVIIIa EML1 8.75 11.5 2.75 na    
XVIIIb EML2 na    
XIX AL 1.25 2.25 2.75 1.25
XVIII–XIX Out       2.75 1.25 2.25 2.75 -1.5
XX JR   0.25     ms
XXI PrB       ms
I + XIV SLS       7.25 7.75 6.75 6.25 0.5
I SL 19.5 7 6 5.5
     
WLS in:   out:   in:   out:  
Walks     CleanUps     -1